The overall objective of the EOSC Horizon Europe FAIR-EASE project is to develop and operate distributed and integrated services for observation and modelling of the earth system, environment and biodiversity implemented in close cooperation with user-communities and research infrastructures in their very design and sustainable availability and evolution. The FAIR-EASE WP5 (Work Package) is in charge of coordinating the activities tackling three different use cases (UCs): 1) the Earth and Environment dynamics; 2) The Environmental Biogeochemical Asset; 3) The Biodiversity Observations. As documented in the FAIR-EASE work plan, all the use cases represent “Real Life-Science” challenges. During the progress of the project, specific Pilots will be considered per UC, each of them addressing specific objectives. This deliverable reports on the assessment of the key requirements and the mapping of main resources to be considered in the project to fulfill the aims and scope of the Pilots included in each use case.

FAIR-EASE_D5.1_Report on key requirements from Use Cases/Pilots

Alessandra GIORGETTI;Catalina REYES;
2023-01-01

Abstract

The overall objective of the EOSC Horizon Europe FAIR-EASE project is to develop and operate distributed and integrated services for observation and modelling of the earth system, environment and biodiversity implemented in close cooperation with user-communities and research infrastructures in their very design and sustainable availability and evolution. The FAIR-EASE WP5 (Work Package) is in charge of coordinating the activities tackling three different use cases (UCs): 1) the Earth and Environment dynamics; 2) The Environmental Biogeochemical Asset; 3) The Biodiversity Observations. As documented in the FAIR-EASE work plan, all the use cases represent “Real Life-Science” challenges. During the progress of the project, specific Pilots will be considered per UC, each of them addressing specific objectives. This deliverable reports on the assessment of the key requirements and the mapping of main resources to be considered in the project to fulfill the aims and scope of the Pilots included in each use case.
2023
File in questo prodotto:
File Dimensione Formato  
FAIR-EASE_D5.1_Report on key requirements from UCs and Pilots.pdf

accesso aperto

Tipologia: Versione Editoriale (PDF)
Licenza: Copyright dell'editore
Dimensione 2.36 MB
Formato Adobe PDF
2.36 MB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.14083/34123
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact